I am going to install arp headstuds with the 1x1 method. my question is when I install the first stud do i torque it down to 30 then install the other studs at 30 then 60 then 80, or do I torque the first one down to 30, 60, 80 then install the second stud and torque it 30 60 80 all indvidually. I know usually you do 30 60 80 on all when you remove the head, but im not sure the process for the 1x1 method